Drainage group

Difference to the project elevation (m)

Types and number of structures

Total

Bridge

Culvert

Pipe outlet

Other

Total

Error

%

Total

Error

%

Total

Error

%

Total

Error

%

Total

Error

%

D-25

−0.10 - −0.49

11

24.5

11

29.8

<−0.50

1

2.2

1

50

(−) elevation

12

26.7

11

29.8

1

50

+0.10 - +0.49

23

51.1

2

40

20

54

1

100

>+0.50

10

22.5

3

60

6

16.2

1

50

(+) elevation

33

73.3

5

100

26

70.2

1

50

1

100

Total

55

45

81.8

5

5

100

47

37

73.7

2

2

100

1

1

100